The Eastwood Home Building Process
Building your dream home ranks up there with the most meaningful milestones in life.
Like any major life event, building a home is a journey. The excitement of starting is so much fun – making choices and signing contracts with high hopes for a great experience! We are committed to keeping our clients a part of the home building process. Below are phases that you can expect over the next several months while your new Eastwood Homes home is being built.
Permits & Breaking Ground
Lots of work happens behind the scenes. This is when we secure the various permits, finalize plans, distribute blueprints to the plumbers, electricians and framers and order materials. It might be several weeks before any visible activity begins on site, but rest assured that all of the background work is being done to create the best build process possible.
Stage 1: Foundation
This is when we prepare the homesite, set foundation forms, install in-slab plumbing and when the concrete is poured and cured.
Stage 2: Framing
You'll be surprised how quickly this is done. One day, there’s nothing but slab. A few days later, there’s a home – well, at least the framework of one, with exterior and interior walls, as well as the roof. This is when you get your first true sense of your home’s breadth and shape.
Stage 3: Weatherproof
This is when the structure becomes "weatherproof." We install decking, flashing and shingles. We also install the windows and wrap the exterior walls with sheathing.
Stage 4: Insulation
All electrical wiring, outlets and breaker boxes are installed at this stage. Air conditioning and heating equipment is put in place, as well as plumbing. This is also when municipal inspections are completed.
Stage 5: Drywall
After electrical, plumbing, HVAC, inspections and insulation are complete and exterior and interior wall surfaces are covered and finished, your home begins to resemble its final form. Brick, stucco and/or stone goes up on the outside. Drywall is installed and texture is applied inside.
Stage 6: Interior Trim and Doors
Once the drywall is complete and the texture has cured, the finish carpenters arrive to install all the interior doors and molding, as well as any staircase railings and balusters.
Stage 7: Kitchen and Bathrooms
Next, we install kitchen and bathroom cabinets. Countertops are set in place and all of the interior is primed and painted.
Stage 8: Finishings
After the paint dries, your plumbing and light fixtures come in. This is also when carpeting, tile and wood flooring is installed.
Stage 9: Complete the Home
During this stage, the Project Manager, Warranty Service Representative and your Personal Builderâ„ perform a thorough inspection of your entire home to assure that it meets our high standards of construction.
Stage 10: Homebuyer Accepts Home
Your Personal Builder will introduce you to your new home, pointing out all its unique features and systems. In as few as 10 days, you will have closed and be given the keys to your brand new Eastwood home. Congratulations and welcome to the family!